Muda Paper Mills has asked CGE Systems to upgrade their wastewater treatment plant in several projects to a total of 25,000 m3/day.
The treatment plant consists of: an equalization tank, static screens, three dissolved air flotation trains, a trickling filter tower, two aeration tanks, three secondary clarifiers and sludge de-watering with belt presses.
The wastewater treatment plant consistently meets the DOE Standard A.